fimmtudagur, 24. október 2013
Browse »
home »
Peninsula Campaign
»
Scratchbuilding
»
Structures
»
Waterbury
»
Building Waterbury 2: Feed Mill - Walls and window openings
Since this building was started well before I began this blog, I don't have photos of the earliest stages of construction. Basically, I built an inner shell of plain styrene (usually .030" or .040"). After locating the window and door openings, I used the well known scribe and snap method to create the window and door openings. After the sub walls were reassembled, I applied the outer layer of Evergreen .040" scribed clapboard siding. Once that's dried, I cut the window and door openings in the clapboard from the back (using the openings in the subwall as a guide).
Next steps on this building....foundation and roofs.....
??
Building Waterbury 2: Feed Mill - Walls and window openings
This view shows the street side wall of the building and the addition that was on the rear of the structure. |
Since this building was started well before I began this blog, I don't have photos of the earliest stages of construction. Basically, I built an inner shell of plain styrene (usually .030" or .040"). After locating the window and door openings, I used the well known scribe and snap method to create the window and door openings. After the sub walls were reassembled, I applied the outer layer of Evergreen .040" scribed clapboard siding. Once that's dried, I cut the window and door openings in the clapboard from the back (using the openings in the subwall as a guide).
Next steps on this building....foundation and roofs.....
??
?
??
?
Gerast áskrifandi að:
Birta ummæli (Atom)
Engin ummæli:
Skrifa ummæli