laugardagur, 20. desember 2014
Browse »
home »
Peninsula Campaign
»
Scenery
»
Scenery; Trees
»
�. and even more Gap Filling
At last approaching the end of the "gap filling" project, at least in the "front aisle."
The area behind the freight house/coal dealer and in the location where Eldredge Woodworking will go in Waterbury had some gaps between the 3D scenery and backdrop, so I got those filled in (the green florist foam is the easiest way to fill these gaps I've found as it "compresses" into the gaps.
A quick coat of earth tone latex paint and it's ready for some scenic textures.
Sitting in front of the television last night I got some more foreground trees prepped and ready for installation in the scene. (The tree on the right shows what these look like when the leaf flocking is added). I just purchased some of the new Scenic Express open cell flocking that I'm looking forward to trying.
�. and even more Gap Filling
The area behind the freight house/coal dealer and in the location where Eldredge Woodworking will go in Waterbury had some gaps between the 3D scenery and backdrop, so I got those filled in (the green florist foam is the easiest way to fill these gaps I've found as it "compresses" into the gaps.
A quick coat of earth tone latex paint and it's ready for some scenic textures.
Sitting in front of the television last night I got some more foreground trees prepped and ready for installation in the scene. (The tree on the right shows what these look like when the leaf flocking is added). I just purchased some of the new Scenic Express open cell flocking that I'm looking forward to trying.
Efnisorð:
Peninsula Campaign,
Scenery,
Scenery; Trees
Gerast áskrifandi að:
Birta ummæli (Atom)
Engin ummæli:
Skrifa ummæli