Sýnir færslur með efnisorðinu Open houses. Sýna allar færslur
Sýnir færslur með efnisorðinu Open houses. Sýna allar færslur

föstudagur, 8. ágúst 2014

Open House - Sunday August 10, 11 am - 2 pm

We'll be hosting an open house this coming Sunday, August 10 from 11 am - 2 pm for the N Scale East Convention "Capitol Limited 2014." The convention is being held in nearby Chantilly (less than 10 miles from us). The large Ntrak layout will be featured in conjunction with the Greenberg Show at the Dulles Expo Center. I believe the clinics/display rooms and the like are in the Holiday Inn directly across the parking lot from the Expo Center.
If any reader of this blog will be in the area and would like to stop by please email me offline for directions, phone numbers and the like.
I'm curious to see how many N scalers actually show up at our open house - I've made it abudently clear the layout is a lot of things, but N scale isn't one of them.
But we'll try to put our best foot forward.
Read More..

þriðjudagur, 15. október 2013

MER Convention Op Session - A couple of photos

Although I failed miserably to take any photos during the open house and op session this weekend Chuck Diljak, who did a fine job as White River Yardmaster, was kind enough to send a couple of  pictures he took during the op session.
Here's the WRJ Assistant YM, Joe Calderone during a break in the action at White River Junction. That yard is entirely too empty and he looks far too relaxed and smiling ..... we'll have to do something about that next time he visits.
A northbound extra through freight (behind a CN F7) runs through a crowded Everett as the Mill Turn works the town.




Read More..

mánudagur, 14. október 2013

MER Open House and Layout Status Report

Running at track speed north of Williams Creek. 
 Just completed a very busy model railroad weekend as part of the NMRA MidEastern Region convention. Not only did I serve as clinic chairman for the convention, I gave a clinic on my railroad and also opened the layout up for two days of open houses and one guest operating session for convention attendees. 
Everett in all of its mocked-up glory....
Of course, the weeks prior to the convention open houses were spent mostly in the basement getting the layout ready. As anyone who has hd their layout on a tour can attest, often times more progress is made in the month before the open house than the six months before!  
Current state of the "front door." It's getting there - many structures to scratchbuild.
Completing this scene is very high on the agenda for the winter! 
I started with a long list of things I'd like to get done - I'd say I managed to finish about 75% of them. I wanted the trains to run fairly reliably, and for the most part succeeded. For my part I made a real effort to get rid of all the visible foam, plaster and plywood by covering it with a coat of earth-colored latex paint. I also got a fair amount of track painted and ballasted. It's amazing how much those two simple things blended everything on the railroad together. 
While I wanted to get the "Foreign road" power we've been operating replaced with CV/SNE/CN etc... power I wasn't quite as successful at that!
We did have issues with some recently ballasted track - and one particularly troublesome set of Proto 2000 FAs. All these issues were fixed  "on the fly" during the open house. I'm more than a little thrilled to report that we had zero issues with the wireless throttles over two days of almost constant running. 
The "back aisle" had been raw plaster, plywood, and pink foam the week before the open house. Some paint, ground foam, and some extra trees made it look presentable if not "Finished."
My crew (Stic Harris, Jeff McGuirk, Ben Hom, Norm Wolf and Bob Warren) did a great job. My parents manned the upstairs. Everyone seemed to have a great time. I didn't get any photos of people gawking at the layout, but here's a few pictures showing how the railroad looks today. 
With the layout up and running it's time to turn my attention to some actual modeling projects. More on those to come in the weeks/months ahead. 
"Yes, I know the station hangs over the edge of the benchwork!" Don't know how many times I had to say that! One thing we didn't get done was the alterations to the benchwork at Essex Junction that will accommodate the station. 

Read More..

mánudagur, 19. september 2011

Open house!

We had about 40 local NMRA members come by and visit over four hours 
during the open house Saturday. I enjoyed having a chance to see old friends, and make new ones and got a kick out of seeing the reaction to some of my rather unusual construction methods. 
      The layout performed well without any issues - I was really pleased especially considering how "temporary" some of the wiring is at this point! I actually laid some track the in the morning and wired it in time for the open house!  I really shouldn't have done that, but I wanted to be able to run the entire length of both sides of the peninsula. I had a list of 10 things I wanted to get done for the open house - issues with one turnout cost me more than a day of troubleshooting which blew the timeline so I didn't get the fascia painted (item no. 10). I considered painting it on Saturday morning, but cooler heads prevailed when I had visions of visitors leaving with splotches of fascia color on their clothes!
Jeff McGuirk (in bright green shirt) chats with Potomac Division members
at the September 17 open house. 
     Jeff (my oldest son, in the green shirt in the photo) came up from Virginia Beach for this event. He helped clean up before the open house and was a great help during the proceedings - he mostly ran the trains and I talked, and talked, and talked. Which apparently isn't really a problem for me . . .
     Everyone who saw the previous layout footprint found the new arrangement to be a real improvement. I'd estimate we had as many as 25 people in the basement at one point. It seemed cramped but not overly crowded - of course I'll never have half that number for an op session. But I concluded the day secure in the knowledge that 8-12 member crew will be very comfortable in the space.
     I reviewed some options for the mill stream arrangement with a few folks, including Dave Emery who's an expert on New England mills. We did come up with a workable arrangement for the Lamson & Goodnow kit but I'm still considering using the Atlas Middlesex building since it seems a little larger, more modern, and might fit the space better.
     I also talked through some decisions that need to be made for the "yard" area - which is still an expanse of open benchwork. Stay tuned to this blog for more details on how that area will shape up in the next few months. 
     The decision to change the layout has been worth the blood and sweat to pull it off. Since the entire layout is actually cleared off I should take a series of pictures as a "walking" tour (Dave showed me some cool pics he took with his "extreme wide angle" setting) and record what it looks like at this point - about nine months to the day after I started construction!

Read More..