Sýnir færslur með efnisorðinu mockups. Sýna allar færslur
Sýnir færslur með efnisorðinu mockups. Sýna allar færslur

fimmtudagur, 11. september 2014

White River Junction Scene Planning

This pre-construction mockup shows how the scene is arranged (it's not in its final position in the room here). the B&M Boston line ends at the wall, and the CV/B&M south staging is stub-ended. I'm considering connecting these two staging yards to form a loop around the furnace and hot water heater.


My posts over the past week on White River Junction ("WRJ in a Garage" and "Lessening the Mouse Hole Effect") produced some email requests for more detail information on the track arrangement at my HO scale version of this iconic New England railroad junction.
To those who don't know, White River station sat in the middle of a wye junction with four "legs" (For an aerial view of White River in the 1950s see this post:
(1)  A joint CV/B&M (technically it was CV to Windsor, then B&M south from there...) down the Conn. River Valley towards Springfield, Mass.
(2) The B&M "Northern" Line to Boston,
(3) The B&M (with CPR trackage rights) line up the Conn River Valley towards Wells River, Vt and ultimately Berlin, NH and
(4) The CV mainline north through Vermont to Montreal (by way of St Albans and the CNR).
Although it was a busy junction for the CV, the majority of the trains were B&M.
In many ways, the entire layout hinged on whether or not I could include White River. Knowing that it was going to be tricky I built this mockup back in February of 2009. For those keeping score, that predates the double-deck version of the railroad. I tried a number of options to get all four legs of the junction "live" on my layout, but the resulting plans always ended up with lots of staging to represent the various B&M lines, and required placing the station and junction in the center of the room - preventing me from modeling some of the other things I wanted to include.
I could see no way to make it all fit so I opted not to model White River Junction, primarily because of that obsession with making all the lines "live."
So I started building a double deck railroad representing a completely different portion of the CV - then in December of 2010 tore most of that out and started again.
And once again I wanted to include White River Jct.
The design for my current layout started with the photo of that mockup from 2009. Only this time I remembered I'm modeling the CV - not the B&M.   So the only B&M trains I model are those that interfaced directly with the Central Vermont. All the others (and there are many) I ignore.
This radically simplified the staging requirements. On my layout the big hole in the wall leads to the joint B&M/CV "South" staging yard. The track to the far left will lead into another hole and into the B&M's Boston staging tracks - currently the South End staging yard is stub ended but I'm seriously looking into connecting the south staging tracks and B&M Boston tracks to form a loop in the utility room.
What of the other two routes?
In my case, the CV mainline continues past the WRJ yard and on to the rest of the railroad.
The line to Wells River, which is behind the station in the overall view, is a dummy track - it crosses the B&M Boston line (protected by a ball signal) and then continues north aboiut 5 inches until it traverses my railroad's steepest grade - 54" straight down to the floor!
Read More..

mánudagur, 28. janúar 2013

Everett, Vermont

Everett, Vermont, looking south. The paper mill will be partially represented with a photo backdrop. I'm getting really sick of looking at pink foam! I bet you are as well!
This is the first time I've shared any pictures of the town of Everett, Vermont on my layout. Although most of the locations on the railroad are based on specific prototypes, this is the one part of the layout that is 100% freelanced. The section of the layout, basically the point where the peninsula connects to the wall, allowed for a relatively deep scene. Why not simply pick another CV town? I considered that for a while, but ultimately decided against it. For one thing, the mainline is on an "S" curve - and most CV northern division towns were arrow straight.  
I also wanted to have a "destination" industry somewhere on the railroad. A destination industry is a single large complex that offers a lot of switching. I intend tos in Everett before returning to White River. I decided on a paper mill. There were paper mills on the CV, but not on the section of the railroad I'm modeling, so the industry is freelanced. Plans call for a dedicated mill turn that leaves White River yard, works the mill and industrial tracks in Everett before returning to White River. Another reason for the freelanced town is a little more pragmatic. I've collected a number of structure kits over the years - while some of them (a generic "store" for instance) are useable in any town on the layout, I wanted one place on the layout where I could readily include some of these kits. 
The buildings shown in these photos are for "locating" purposes only. I may or may not place them in the locations shown - in fact I welcome any suggestions on town/road building arrangements! 
But you can see the basic setup- the paper mill complex in the corner; a small station; a couple of stores - represented by boxes at this point!; a freight house, and a feedmill. The feedmill is a kit from Stella Scale Models. Although not a Vermont prototype it's a very typical small town feedmill. 
Williams Creek is just around the bend. The mockups in the distance are
 downtown White River Junction, Vt.
 
Everett is just around the bend from Williams Creek, the scene shown in the header photo on this blog. Some of the you know that scene is named after Zeb Williams, one of my college classmates.  Todd Everett is another Citadel classmate. 



Read More..

þriðjudagur, 17. janúar 2012

White River Junction in 3-D

A group of high school students in Hartford, Vt., have developed a really neat 3-d map of White River Junction using Google Maps and Sketch up to create very realistic renderings of the buildings. Also included are short histories of many of the key structures in the village.

You need Google Earth plug in to explore the 3-d map - but it's well worth spending a few minutes walking around town!

This screen shot shows the familiar White River Junction station in the center - the CV track is curving to the left from the bottom of the picture, the B&M line to Wells River curves to the right. On the extreme right you can see the B&M Northern Line to Boston.  Although the tracks aren't clearly indicated, you can see where the B&M diamonds were located. 


"Walking" up the river (yes, you can virtually wander around in the 3-D landscape) you can get a view of a number of key structures in White River Junction. One of the most familiar, forming a backdrop for the Central Vermont yard, is the billboard on the Ward Baking Co. 





Read More..

miðvikudagur, 14. september 2011

Down by the Old Mill Stream



Making some progress on the mill stream scene. I got the New England Brownstone culverts painted and installed, and carved the large hill that divides the peninsula in half to shape. I also got a coat of "ground goop" on the hill and started on the riverbed before I gave out last night. In this shot, I hadn't gotten the track shimmed - hence the "washed out" look!




This shot shows the area (to the left and right of the river) where the other two planned mills may go (L&G to the left; Delabarre Woolen to the right):



Goal for tonight is see if the L&G kit will fit the area. I may well decide to go with an Atlas Middlesex Mfg. kit since that may take less room than the L&G complex. 

Then I have to get the layout room cleaned up for the open house this weekend!

Marty
Read More..

Peninsula Progress Report - I


With the Williams Creek scene basically completed I decided to start the rough scenery on the mill stream scene that bisects the lobe end of the peninsula. 




I've got the foam stacked for the hill that will serve as a viewblock between the town scene and the mill stream in place. The cardboard mockups are for one of the three planned mills along the river � this particular mill is based on the Berry Excelsior Mill from NH � the cardstock mockup closest to the camera is the Berry Machine Shop. The other mill in this scene will be the upcoming South River Modelworks "Delabarre Woolens" - that will go to the lower right of the photo. Although freelanced, it looks a lot like one of the mills that stood alongside the CV tracks north of Eagleville, Conn.
 

A third mill, in the large area to the lower left of the picture, is a possibility as well. It may be Lamson & Goodnow - another SRMW kit that's my model railroading albatross, the Atlas  brick factory kit, or a scratchbuilt structure. Frankly, I may opt not to add a mill anything to the area in the interest of preventing an overly crowded appearance.

You can see I've cut the stream bed into the foamboard and the point where the spillway will be installed should be apparent - even in this pink wonderland.

The last photo shows where the mill stream will leave the modeled portion of the scene - the track is on a curve here so I decided to go with a culvert (from New England Brownstone) instead of a bridge.



Read More..

miðvikudagur, 29. júní 2011

Waterbury Peninsula Campaign - the planning continues . . .

A few days ago I described the basic approach I'm taking with the peninsula area. When I started laying out the path for the waterways, I quickly determined one of two options - both of which are shown in my rather rough sketch attached.
The first shows the river arranged as I've been planning - essentially the water "disappears" (somewhat gracefully, I hope) around a bend and between two low hills. One of those hills forms a "background" for the feedmill and freighthouse in Waterbury.

OPTION 1:



The area around the station/feedmill will remain a "freelance free zone" - in other words it will be prototype specific. Some of the rest of Waterbury will be freelanced as needed to best fit the space.
NOTE: The white building in the lower right is a Branchline creamery kit. The white line through the center represents a road. (hey, Rick Johnson I'm not . . .) Not sure the creamery will remain in that location.
Although this looked okay on paper, and in initial planning - looking at it now I'm thinking the river/feedmill/background hill is just a little too cramped. It just doesn't look natural. To look right a mill should have a intake and an upper pond, with a falls, and a lower pond. I have that here, but it looks too forced - and the lobe end of the peninsula would end up with a few town buildings, a street, and a bunch of trees . . . and believe me when you model New England the last thing you need is a reason to make even MORE trees . . .

OPTION 2: 


This shows my current leanings - and it offers the advantage(?) of possibly adding a second mill (with another dam/falls) in the location currently occupied by the creamery building.
More importantly, even without a second mill complex, I think the water course looks a lot more natural. The hills (represented by the stacked foamboard) can be moved slightly to the right - which will free up the area behind the feedmill and freight house.
Disadvantage - I'll have to add another bridge to the mainline along a curve in the foreground. It doesn't have to be a particularly long bridge, but bridges, especially on curves, can be a real pain. One possibility is a large culvert (or even two culverts) is one possibility. The other may be to do what Paul Dolkos suggested and simply let the river "disappear" behind some trees.
Perhaps that bane of New England modelers - all those trees - are useful additions to our bag of tricks. 

It's almost time to fire up the foamboard excavation tools . . .
Read More..

mánudagur, 27. júní 2011

Peninsula Campaign - Part 1 - Planning*

I've been accused on not doing "enough planning" in the past. I'd say I do too much planning, but it tends to take a 3-d form like this.

I spent some time last evening creating and arranging mockups (of structures, and of some of the landforms) on the lobe end of the peninsula.

The peninsula in question is located at the entrance to the layout area of the basement. One side of the peninsula is devoted to the Waterbury, Vermont scene, the key elements of which are the station, the feedmill located directly across the tracks from the station, and the freight house (which is not mocked up in these photos). While there were small industries located trackside in Waterbury, I'm not planning on modeling all of them.

The question of how to handle the "other side" of the peninsula has been a particular sticking point. I've long had an interest in water-powered mills in New England - but modeling one of a narrow shelf is problematic since to accurately portray how they function there has to be an "lower pond" and an upper pond, separated by a dam. Also, some of these mills were massive rambling affairs - what I was looking for was a (preferably) wooden mill - definitely more of a scenic highlight that an major traffic generator for the ole' SNE.

I started with a BEST Trains kit (http://besttrains.com/products_1008.html) for the Berry Machine shop in Wolfeboro, NH. When I got that kit, Dave Emery mentioned to me he had plans for the rest of the mill complex. He kindly lent me the 3-ring binder filled with drawings for each of the mill buildings and detailed information on how the mill operated. Believe it or not, this place was in business into the 1970s - still making rail shipments until that time.

After spending some time sketching out the plan, I figured it was promising enough to move on to the next step - a three dimensional mockup of the entire peninsula.  I don't do this for every scene I model, but with all the elements involved here I felt It was important to see how the water, the mill buildings, and, Waterbury station scene would all fit together. And, perhaps most importantly, see if I could maintain some visual break between the two sides of the peninsula.

The photos show how this has progressed to this point.

The first image shows the Waterbury station scene - note: the structures are obviously unfinished or "stand ins" at this point. In the second photo, there will be an industry (a canning plant) built "into the hill." You can see the end of the canning plant spur in the lower left corner of the picture:


The next photo shows the view looking back from the "mill side" peninsula - NOTE: the roof height on these mockups will actually be lower on the modeled scene since I have to "excavate" the river bed. The red mockup in the background is the Machine Shop - the penstock and boilerhouse (outlined on the paper) are also included in the BEST Trains kit. River will go between the large mill building on the right and the grain mill and woodshed (the two mocked up buildings on the left. River will then widen out to form the lower pond beyond the penstock, with the water flowing "into the hillside" to the right (behind the main mill structure).





Here's a view looking from Waterbury towards the end of the peninsula (NOTE: the looming 1" scale dollhouse is only there for me to finish wiring it . . . it doesn't reside there permanently!)

Initial assessment:
1.  The elements will all "work" and seem to fit the space without looking overly crowded.
2. The hills may have to have an unrealistically steep angle behind the feedmill to help mask the end of the backdrop and still allow the depth for the mill. One possibility would be to shorten the main mill building slightly - the other would be to make the ridge one piece of foam taller. Also, the trees add about 3-4" of height to the ridges.
3. Even if some of the rooftops on Watebury are visible on the mill side - or vice versa - they will look like roofs poking through the trees - so this may not be a big problem.
3. Photoshop backdrops for the sky will be a necessity for overall "pretty pics" of this end of the layout. Close up, low angle shots will work much better in this section.




 
*The name of this thread is presented with all due deference to the Duke of Wellington, General McClellan, etc . . .
Read More..

laugardagur, 19. febrúar 2011

Waterbury - Early test fit


One of my main goals in building this layout is to recreate some of the wonderful prototype photographs taken of the CV during the late steam era. Perhaps one of the best known photographers of the era was Philip Hastings. In fact, it was one picture of the Ambassador slowing for a stop in Waterbury that appeared in Bob Jone's book, Central Vermont Railway, A Yankee Tradition Vol. 5, that made me decide to shift my era back to the steam era.

If the scene looks at all familiar, the header image for this blog is a Bob Carey photograph also taken in Waterbury.

I've built - actually the better term is I've started to build - bits and pieces of the elements needed to recreate that photo over the years. And, although I still have a ways to go, the rudimentary mockup here shows that I will, at long last, be able to recreate that scene.

I built the feedmill from styrene, and the station is a product of my good friend Bernie Kempinski's laser engraver. I have a ways to go to get all the necessary elements in place, but I was so excited about the prospect of what is to come that I wanted to share it.

At this point I haven't decided if I will work on this scene, Essex Junction, or "the bridge" first - it will most likely be the latter since, well, it's the closest to being done, but I can't wait to finally get the Waterbury station scene built.


Read More..

Test-fitting Essex Junction's trainshed

Progress has been a little slower than I'd hoped, but things are starting to pick up!


I'm happy to report that this evening, after spending a pleasant day with a bunch of C&O modelers, I came home and got a coat of sky blue paint on the new peninsula backdrops. It's a simple task, but not a particularly enjoyable one - likely the reason I'd been putting it off. But at least it's done. It's amazing how much it brightens up the room.

I also dug out my drawings of the Essex Junction trainshed and used them to make this somewhat rudimentary mockup of the shed and station. I know it may be a while before I get around to building the real model, so this will help with planning the scene. Also, I wanted to confirm the dimensions of the actual model just to be sure the trains can actually run through the shed without hitting the roof joists.

The mockup is made from matte board. I have some black matte board that I'll use to add a roof. Seeing the building "full size" in mockup form convinces me I need a good plan for getting inside the the finished model for access, track cleaning and maintenance.

A removable roof - or at least some portion of the roof being removable, seems to be the answer. I need to think through that one.

I also started toying with building arrangements in Waterbury - but I'll keep that in a separate post.




Read More..